Pacific Ridge School

Pacific Ridge School

This pre-engineered building is being used as a physical fitness for a private school in Carlsbad, CA. The metal building has a standing seam roof over banded R-30 PSK-VR insulation. Exterior structure was concrete pour and place walls with stucco finish.
Poway

Poway

Our crew at Pascal Steel supplied and erected this 110′ clear span pre-engineered building for a private contractor in Poway, CA. The building has standing seam metal roof with R19 roof insulation. The walls are PBR with R-13 insulation.
Recycle Center

Recycle Center

This project was a 25,000 sq. ft. pre-engineered metal building that is being used as a Recycle Center on the military base in Camp Pendleton, CA. The building was 125 ft. clear span that we modular framed in sections, on the ground, and lifted into place by using two 40 ton...